Green Leaf at Killian Hill

Stone Mountain, GA

Project consisted of infilling an existing apartment complex with additional units and adding enclosed garages for tenant use.  The existing apartment complex was developed in the early 1980s and did not have the density that the new owners wished to achieve.  Challenges consisted of dilapidated drainage and detention structures, working with existing utility locations, and bringing the site up to current code with water quality and detention requirements while preserving as many trees and existing features on site. 

The project is designed to be developed in two phases.  The first phase consisted of adding the garages for tenant use and the second phase consisted of adding additional units and parking.

Infill sites present definite challenges when working around existing conditions, but offer the advantage of a developed infrastructure.

J M Smith Engineering LLC

155 Clarkesville Street

Cornelia, GA 30531

Phone: 706.894.2331

Fax: 678.267.3731

www.jmsmithengineering.com

 

Quick Glance

 

 Infill development of existing multifamily development

 Added parking garages and 32 units while maintaining character of development

 Rehabilitation of failing existing detention ponds to bring to current design standards

 

 

 

 

 

 

Project Profile

Multi-family Residential

F Developments